According to a post by Oil and Gas Industry at LinkedIn:
“The FPSO will allow initial separation of gas from the oil extracted in the deep offshore reservoir and will have a production capacity of 180,000 barrels of oil per day (bopd) and 7.2 million cubic metres of (mcbm) gas per day, with a storage capacity of two million barrels of oil.” (2)


